100×100 Metal Building Special

Specials Quote Request

This field is for validation purposes and should be left unchanged.
Name(Required)
Email(Required)
Shipping Info (State/Zip)(Required)

 

Description

Engineered for long‑term performance, this dependable 100×100 metal building special is in stock and ready to support your next project with proven strength and efficiency.

Included Features

  • 100×100 Steel Building
  • 2 Framed Opening
  • 30 lb Snow Load
  • 107 mph Wind Speed

Not Included: Freight, gutters and downspouts, taxes, moisture barrier, walk doors, overhead doors, construction.

Unlock exceptional value with our Commercial and Residential metal building specials. These pre‑engineered packages are designed for fast delivery, streamlined construction, and reduced engineering costs—giving you a durable, cost‑effective structure without compromising quality.

Take advantage of industry‑leading pricing while inventory lasts. Choose from our most popular dimensions to create a building that fits your needs and your budget.

FAQ

Buildings of this size require significant staging space. Ensure a 20–24 ft wide access path, firm ground for offloading, and room for a crane or telehandler. Provide details on slopes, tight turns, or overhead obstructions when requesting freight.

Engineered for 30 psf snow load, 107 mph wind speed, and IBC 2018. If your jurisdiction requires higher loads or a different code cycle, request an engineered upgrade or alternate SKU.

Distribution centers, fabrication shops, agricultural storage, fleet maintenance, and light industrial operations commonly use this footprint due to its large clear span and high eave height.

Overhead cranes require additional engineering and reinforcement. Provide load requirements early so we can confirm feasibility or recommend an upgraded design.

Freight depends on distance, load size, and site access. Provide your ZIP code and delivery notes for an accurate estimate.

Yes. Interior buildout is flexible. Offices, mezzanines, and conditioned areas can be added as long as they don’t modify primary structural members without engineering approval.

With an experienced crew, assembly may take one to three weeks, depending on weather, equipment, and site prep.